Supplied and fitted across the UKFree surveyWritten fixed quoteGuide prices published0800 088 6248

Passivhaus and EnerPHit · Leicestershire

Passivhaus and EnerPHit windows in Oadby

From the first measure to the handover pack, we handle Passivhaus and EnerPHit windows for homes in Oadby and the rest of Leicestershire.

LE2Postcode district
1.4U-value limit, England (W/m²K)
7h 38mDaylight, 21 Dec
14°Midday sun, 21 Dec
Timber-clad low-energy house with deep-set windows and external shading

Certified-component systems on request, with data for PHPP. Passivhaus is a building standard from the Passive House Institute; EnerPHit is its version for retrofits.

Winter light and glass choice in Oadby

Winter days in Oadby are short: about 7 h 38 min of daylight on 21 December, with the sun peaking near 14°. That low angle reaches deep into south-facing rooms, so we match the glass to each elevation rather than using one spec for the whole house.

Guide prices in Oadby

GuideSupply and fit, inc VAT
uPVC low-energy window
medium, deep frame, Uw about 0.8 or better
£1,395 – £1,795
Timber low-energy window
medium, thermally broken
£2,395 – £2,995
Alu-clad timber low-energy window
medium, certified-component systems on request
£2,695 – £3,395

Guide prices. Your written quote after the free survey fixes the price for the specification shown.

Rules for Passivhaus and EnerPHit in England

In England, replacement windows must meet 1.4 W/m²K, or a Window Energy Rating of band B or better. Replacement windows are a controlled fitting. A competent person scheme installer (such as FENSA or Certass) self-certifies the work and notifies the council within 30 days; otherwise a building control body approves it.

Before ordering: Replacing windows on a house is normally permitted development if the new ones look similar. New upper-floor windows in a side wall must be obscure glazed and fixed, or open only above 1.7 m. Flats and maisonettes have no householder permitted development rights, so a change that alters their appearance needs planning permission. An Article 4 direction in a conservation area may mean permission is needed, and listed buildings need listed building consent.

How it works

You will know exactly what you are buying: the quote states the unit build-up, frame, finish, fitting work and how Building Regulations compliance is handled. On fitting day each opening is replaced and closed up before the team moves on.

  • Guide prices published, not hidden
  • No pressure: the quote is yours to keep
  • Frames, glass and fitting in one contract
  • Advice on planning and consents before you order

Questions from Oadby

What is EnerPHit?

The Passive House Institute’s standard for retrofitting existing buildings, with slightly relaxed targets compared with new Passivhaus builds.

Can you fit to my designer’s details?

Yes. We agree position, fixings and airtightness details with your designer before ordering.

Do I need permission for Passivhaus and EnerPHit windows in Oadby?

In England, like-for-like replacements on a house are normally permitted development; flats need permission if the change alters their appearance, Article 4 areas may need permission, and listed buildings need listed building consent. Check whether your street is in a conservation area or covered by an Article 4 direction before changing the style.

How long does it take to get Passivhaus and EnerPHit windows fitted in Oadby?

After the survey, typical manufacture time is 8 to 14 weeks, and most homes are fitted in 1 to 4 days.

Nearby

Nearby towns on our list include Wigston (3 km), Leicester (5 km), Market Harborough (18 km) and Loughborough (20 km).

Other products in Oadby

Passivhaus and EnerPHit in Oadby: book your free survey

Written quote fixed for the specification, after a free survey. Building Regulations sign-off by a competent person scheme installer or building control, as the law requires in England.

CallGet a quote