New builds and self-builds · Perth and Kinross
Triple glazing for new builds and self-builds in Auchterarder
New-build triple glazing for homes in Auchterarder: measured on a free survey, made to order and fitted by installation teams working for us across Perth and Kinross.

U-values, g-values and installation details for your assessor. Triple glazing is not required by Building Regulations for new homes, but it helps a new dwelling meet its overall energy target.
Winter light and glass choice in Auchterarder
In Auchterarder, midday sun in late December sits around 10° high, with roughly 6 h 53 min of daylight. For windows facing north or shaded by neighbours, cutting heat loss matters more than solar gain; on open south-facing glass, ask about a higher solar-gain unit.
Guide prices in Auchterarder
| Guide | Supply and fit, zero-rated (new home) |
|---|---|
| uPVC package about 22 m2 of windows and doors | £11,195 – £13,895 |
| Aluminium package about 22 m2 of windows and doors | £18,895 – £23,595 |
| Alu-clad timber package about 22 m2 of windows and doors | £24,795 – £30,995 |
Guide prices. Your written quote after the free survey fixes the price for the specification shown.
Rules for new builds and self-builds in Scotland
For a new home in Scotland, windows and doors are part of the building warrant for the build: they must average 1.6 W/m²K across all windows, doors and rooflights, with no single unit worse than 3.3. The house itself needs planning permission.
VAT: supply and fitting by a VAT-registered contractor in the construction of a new home is normally zero-rated, so new-build guide prices are shown without VAT; supply-only purchases carry 20% VAT, which self-builders can usually reclaim through HMRC’s DIY housebuilders scheme.
How it works
The surveyor measures every opening, checks ventilation, escape windows and safety-glass zones, and talks through styles. Your written quote lists each item with its glass build-up and U-value, and the price is fixed for that specification.
- Guide prices published, not hidden
- No pressure: the quote is yours to keep
- Frames, glass and fitting in one contract
- Advice on planning and consents before you order
Questions from Auchterarder
Can you price from drawings?
Yes. Send your drawings or window schedule and we will price a package, then confirm sizes on site before manufacture.
Do you supply performance data for SAP?
Yes. Your energy assessor gets the U-values, g-values and frame data for the systems quoted.
Do I need permission for new-build triple glazing in Auchterarder?
In Scotland, a new home needs planning permission, and its windows and doors are approved through the build’s own Building Regulations application rather than as replacements.
How long does it take to get new-build triple glazing fitted in Auchterarder?
After the survey, typical manufacture time is 6 to 12 weeks, and fitting is planned around your build programme.
Nearby
Nearby towns on our list include Crieff (12 km), Perth (20 km), Kinross (20 km) and Alloa (21 km).
Other products in Auchterarder
- uPVC windows
- Aluminium windows
- Timber windows
- Alu-clad timber windows
- Casement windows
- Flush casement windows
- Tilt and turn windows
- Sash windows
- Bay and bow windows
- Fixed and picture windows
- Composite front doors
- French doors
- Sliding patio doors
- Bifold doors
- Glass-only replacement
- Acoustic triple glazing
- Security glazing
- Whole-house replacement
- Period homes and conservation areas
- Flats and apartments
- Passivhaus and EnerPHit
New builds and self-builds in Auchterarder: book your free survey
Written quote fixed for the specification, after a free survey. No building warrant is needed for a straight replacement in Scotland; we fit to the building standards and give you a written handover pack.
